Sunday 10 January 2021

THE METROPOLITAN RAILWAY, THE LDN UNDERGROUND

Today, The Grandma continues relaxing at home. The weather is still cold, and it has been raining all day. She has decided to read about the world's oldest underground railway, the Metropolitan Railway, that opened between Paddington and Farringdon, marking the beginning of the London Underground, on a day like today in 1863.

The Metropolitan Railway (also known as the Met) was a passenger and goods railway that served London from 1863 to 1933, its main line heading north-west from the capital's financial heart in the City to what were to become the Middlesex suburbs. Its first line connected the main-line railway termini at Paddington, Euston, and King's Cross to the City.

The first section was built beneath the New Road using cut-and-cover between Paddington and King's Cross and in tunnel and cuttings beside Farringdon Road from King's Cross to near Smithfield, near the City. It opened to the public on 10 January 1863 with gas-lit wooden carriages hauled by steam locomotives, the world's first passenger-carrying designated underground railway.

The line was soon extended from both ends, and northwards via a branch from Baker Street. Southern branches, directly served, reached Hammersmith in 1864, Richmond in 1877 and the original completed the Inner Circle in 1884.

The most important route was northwest into the Middlesex countryside, stimulating the development of new suburbs. Harrow was reached in 1880, and from 1897, having achieved the early patronage of the Duke of Buckingham and the owners of Waddesdon Manor, services extended for many years to Verney Junction in Buckinghamshire.

Electric traction was introduced in 1905 and by 1907 electric multiple units operated most of the services, though electrification of outlying sections did not occur until decades later. Unlike other railway companies in the London area, the Met developed land for housing, and after World War I promoted housing estates near the railway using the Metro-land brand.

On 1 July 1933, the Met was amalgamated with the Underground Electric Railways Company of London and the capital's tramway and bus operators to form the London Passenger Transport Board.

 More information: Odd Salon

Former Met tracks and stations are used by the London Underground's Metropolitan, Circle, District, Hammersmith & City, Piccadilly, Jubilee and Victoria lines, and by Chiltern Railways and Great Northern.

In the first half of the 19th century the population and physical extent of London grew greatly. The increasing resident population and the development of a commuting population arriving by train each day led to a high level of traffic congestion with huge numbers of carts, cabs, and omnibuses filling the roads and up to 200,000 people entering the City of London, the commercial heart, each day on foot.

By 1850 there were seven railway termini around the urban centre of London: London Bridge and Waterloo to the south, Shoreditch and Fenchurch Street to the east, Euston and King's Cross to the north, and Paddington to the west. Only Fenchurch Street station was within the City.

The congested streets and the distance to the City from the stations to the north and west prompted many attempts to get parliamentary approval to build new railway lines into the City. None were successful, and the 1846 Royal Commission investigation into Metropolitan Railway Termini banned construction of new lines or stations in the built-up central area.

The concept of an underground railway linking the City with the mainline termini was first proposed in the 1830s. Charles Pearson, Solicitor to the City, was a leading promoter of several schemes and in 1846 proposed a central railway station to be used by multiple railway companies.

The scheme was rejected by the 1846 commission, but Pearson returned to the idea in 1852 when he helped set up the City Terminus Company to build a railway from Farringdon to King's Cross

The plan was supported by the City, but the railway companies were not interested and the company struggled to proceed.

The Bayswater, Paddington, and Holborn Bridge Railway Company was established to connect the Great Western Railway's (GWR's) Paddington station to Pearson's route at King's Cross. A bill was published in November 1852 and in January 1853 the directors held their first meeting and appointed John Fowler as its engineer.

After successful lobbying, the company secured parliamentary approval under the name of the North Metropolitan Railway in mid-1853. The bill submitted by the City Terminus Company was rejected by Parliament, which meant that the North Metropolitan Railway would not be able to reach the City: to overcome this obstacle, the company took over the City Terminus Company and submitted a new bill in November 1853. This dropped the City terminus and extended the route south from Farringdon to the General Post Office in St. Martin's Le Grand.

The route at the western end was also altered so that it connected more directly to the GWR station. Permission was sought to connect to the London and North Western Railway (LNWR) at Euston and to the Great Northern Railway (GNR) at King's Cross, the latter by hoists and lifts. The company's name was also to be changed again, to Metropolitan Railway. Royal assent was granted to the North Metropolitan Railway Act on 7 August 1854.

Construction of the railway was estimated to cost £1 million. Initially, with the Crimean War under way, the Met found it hard to raise the capital. While it attempted to raise the funds it presented new bills to Parliament seeking an extension of time to carry out the works. 

 More information: Express

In July 1855, an Act to make a direct connection to the GNR at King's Cross received royal assent. The plan was modified in 1856 by the Metropolitan (Great Northern Branch and Amendment) Act and in 1860 by the Great Northern & Metropolitan Junction Railway Act.

Board of Trade inspections took place in late December 1862 and early January 1863 to approve the railway for opening. After minor signalling changes were made, approval was granted and a few days of operating trials were carried out before the grand opening on 9 January 1863, which included a ceremonial run from Paddington and a large banquet for 600 shareholders and guests at Farringdon. Charles Pearson did not live to see the completion of the project; he died in September 1862.

The 6 km railway opened to the public on 10 January 1863, with stations at Paddington (Bishop's Road) (now Paddington), Edgware Road, Baker Street, Portland Road (now Great Portland Street), Gower Street (now Euston Square), King's Cross (now King's Cross St Pancras), and Farringdon Street (now Farringdon).

The railway was hailed a success, carrying 38,000 passengers on the opening day, using GNR trains to supplement the service. In the first 12 months 9.5 million passengers were carried and in the second 12 months this increased to 12 million.

The original timetable allowed 18 minutes for the journey. Off-peak service frequency was every 15 minutes, increased to ten minutes during the morning peak and reduced 20 minutes in the early mornings and after 8 pm. From May 1864, workmen's returns were offered on the 5:30 am and 5:40 am services from Paddington at the cost of a single ticket.

More information: The Guardian


I just like being on my own on trains, traveling.
I spent all my pocket money travelling
the London Underground and Southern Railway,
what used to be the Western region,
and in Europe as much as I could afford it.
My parents used to think I was going places,
but I wasn't, I was just travelling the trains.

 

Tony Judt

No comments:

Post a Comment